The work described by these specifications includes the furnishing of all labor, materials, equipment, testing, and training to provide a complete and workable power system, including but not limited to the generator, the controller, automatic transfer switch, and delivery and installation as specified herein. It is the intent of these specifications to have a single source responsibility for the generator. That is, the power system shall be finished by a single contractor who shall be responsible for the design, coordination, and testing of the complete system. All equipment shall be new and of current production of a national firm that manufactures generator sets and controls, switchgear, and/or associated accessories. The contractor shall be responsible for removing the existing (old) diesel generator and diesel fuel tank located at the Baldwin County Foley Satellite Courthouse, 201 East Section Avenue, Foley, AL 36535 and placing the existing (old) diesel generator and diesel fuel tank on a truck or trailer for hauling away by County staff. The new natural gas generator will be placed on the existing concrete pad. Riviera Utilities will then install the natural gas meter and regulator, and the contractor will make at least one return visit to the site to complete the installation, including but not limited to connection of the natural gas meter and regulator to the new natural gas generator. The contractor will also be responsible for removing and properly disposing of the existing automatic transfer switch and installing a new automatic transfer switch (ATS). The contractor is strongly encouraged to visit the site and become familiar with the existing generator screen walls, ATS location, overall access to the site, and become aware of the means and methods required to deliver and place the new natural gas generator as well as place and operate any lifting equipment needed for removal of the existing (old) diesel generator and diesel fuel tank and placement of the new natural gas generator and ATS.