Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. GENERAL NOTES: 1. REMOVE DAMAGED WOOD FRAME STRUCTURES; 2. FIELD VERIFY ALL SITE CONDITIONS; 3. REMOVE CMU/BRICK PIERS AND OR CONCRETE SLAB(S) FIELD VERIFY; 4. REMOVE ALL TIRES, TRASH, ROOF REMNANTS, GARBAGE, ETC. OFF SITE; 5. ALUMINUM FENCE SHALL REMAIN; 6. REMOVE ALL VINES, BUSHES, SHRUBS ALONG THE ENTIRE PERIMETER AND CUT TREES WITH A CALIPER OF 8" OR LESS 4” ABOVE GRADE WITHIN THE PROPERTY LINES/FENCE LINE. 7. CLEAR ENTIRE LOT, REMOVE ALL TRASH/GARBAGE, CUT ALL GRASS/WEEDS UP TO PROPERTY LINES. 8. CONTRACTOR SHALL FILL ALL VOIDS OF DISTURBED AREAS PER SECTION 02100 DEMOLITIONS BY WET METHOD AND SECTION 02100 SEEDING. 9. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES. (FULL PROTECTION OF STATE WATER-DOG RIVER WATERSHED); 10. CAP ALL SEWAGE LINES AT THE CURB: NOTIFY MUNICIPAL ENFORCEMENT DEPARTMENT WHEN SEWAGE LINE IS CAPED. 11. BEFORE AND AFTER PHOTOS ARE REQUIRED WITH PAY REQUEST.