Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. The following are included in the scope of work: EXHIBIT AА: EXHIBIT BB: SPECIAL PROVISIONS FOR EROSION AND SEDIMENT CONTROL ON DEMOLITION SITES BEST MANAGEMENT PRACTICES FOR DEMOLITIONS WHERE LEAD-BASED PAINT AND/OR ASBESTOS CONTAINING MATERIALS MAY BE PRESENT PROJECT PHOTO, LEGAL DESCRIPTION, GENERAL NOTES AND MAP SECTION: 00100 INSTRUCTIONS FOR QUOTES SECTION: 02100 DEMOLITION BY WEТ МЕТНOD SECTION: 02921 SEEDING EXHIBIT 1: E-VERIFY (Sample document) EXHIBIT 2: EXHIBIT 3: AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A STIPULATED SUM (Sample document) CITY OF MOBILE INSURANCE AND ENDORSEMENT REQUIREMENTS EXHIBIT 4: APPLICATION AND CERTIFICATION FOR PAYMENT AND EXHIBIT 5: CONTINUATION SHEET G702 AND G703 (Sample documents) CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS G706 (Sample document) CONTRACTOR'S AFFIDAVIT OF RELEASE OF LIENS - G706 A (Sample document)