Project Title: Repair Natural Gas Distribution System, Maxwell AFB, AL
Project Location: Maxwell AFB, AL
Furnish all plant, labor, equipment and materials and perform all operations in connection with the Gas Line Repair (Project # PNQS 25-8705) to include all areas as indicated on drawings and in strict accordance with the specifications. The work generally consists of the following:
1. Cut and Cap existing gas line (IAW PNQS 25-8705 SOW)
2. Place new gas lines (IAW PNQS 25-8705 SOW)
3. Place new gas valves (IAW PNQS 25-8705 SOW)
This requirement is 100% Small Business (SB) Set-Aside.
The magnitude of construction is between $250,000.00 and $500,000.00.
The purpose of this amendment is to update the site visit date from 06 June 2025 at 0900 to 09 June 2025 at 0900. Questions are due to Mr. Jaeden Alvarez (jaeden.alvarez.2@us.af.mil) on 10 June 2025 at 1200.