Work to be performed by HVAC Contractor under this Agreement shall consist of furnishing all labor, materials, insurance, tools, supplies, and equipment necessary for the complete replacement of the second-floor west wing HVAC system at the Mobile Police Department Headquarters Building located at 2460 Government St, Mobile, AL 36606. • Assessment of the existing conditions, floor plan, and requirements of conditioning • Assessment of the existing electrical service and determine if it’s adequate for the new units/equipment to be installed. Upgrade if necessary • Prepare all permitting documents and acquire all permits required for construction (fees will be paid by the City) • Prepare complete engineering, design, construction plans, and cost estimates for the units to be utilized on this project, including more energy-efficient equipment options • Assessment of the existing building including access for the new units to be installed and removal requirements • Construct the approved construction plan that will conform to all required codes • Removal of the existing two (2) 10-ton HVAC units on the second floor • Contractor responsible for proper disposal of existing units • Provide two new vertical water source heat pumps • Provide two new wall mounted programmable thermostats