Specifications include, but are not limited to: furnishing of all labor, materials, tools and equipment necessary for the Electrical upgrades as part of the repair work for the Pump House structure. All Electrical equipment including all associated conductors, conduit boxes, etc. to be upgraded (removed and replaced) as well all the removal and replacement of all existing light fixtures. This is the first phase of the work for the pump house which will include the later phase of work to remove and replace the existing South and North East walls of the pump house due to extensive termite damage. This electrical panel services the existing irrigation system (to remain intact), and it is desired to have as short of time period with no electrical service to the irrigation as possible. Existing Electrical service not to be disconnected until new panel is ready to be activated, and minimum electrical service disruption is the goal.