Specifications include, but are not limited to: A. 1. Definition. Paint as used herein, means coating systems materials including primers, fillers and other whether used as a prime intermediate or finish coat. If applicable, any paint (materials used an apartment/building), shall be carried over for the next work order. Any materials remaining a work order is completed shall be turned over to the Property Manager or HABD representative for that location. Mix and prepare paint materials according to manufacturer's written Instruction. 4. Paint exposed surfaces, except where the paint schedule (provided by Asset Manager) indicates that a or material is not specifically mentioned, paint item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate color or finish Do not paint over Underwriters Laboratories (UL) Factory Mutual (FM), or other code required labels or equipment name, Identification, performance rating, or nomenclature plates. 6. Use an adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work. 7. The contractor while in the owner. of materials is responsible for the storage of the materials. Should any be lost or stolen, it will be responsibility of the contractor for replacement at no cost B. EXTERIOR PAINTING: Exterior paint colors and areas to painted will be site dependent. Contractor will be given paint colors and instruction as to what needs painted by the Contract Administrator and/or Asset Manager.