The 2023 Pathway Gap Closure Program project consists of constructing new 8-foot-wide pathway to fill in gaps at twelve locations in Macomb Township: 25 Mile Road (between Romeo Plank Road north of 25 Mile Road and Romeo Plank Road south of 25 Mile Road); 25 Mile Road (between Romeo Plank Road south of 25 Mile Road and Luchtman Road); Romeo Plank Road (just south of 25 Mile Road); Romeo Plank Road (between 25 Mile Road and 24 Mile Road); 22 Mile Road (just west of Card Road); Card Road (between 22 Mile Road and Ambassador Drive); Card Road at 22 Mile Road; Card Road (just north of 22 Mile Road); 22 Mile Road (between Briar Pointe Drive and Morning Glory Drive); 22 Mile Road (between Shenandoah Drive and Briar Pointe Drive); 22 Mile Road (between Wingfield Boulevard and Monarch Drive); and Card Road (between Antrim Dells Boulevard and Homestead Drive). The work includes approximately 22,000 square feet of 4-inch pathway, 8,000 square feet of 6-inch pathway, 200 square feet of 6-inch pathway ramps, and other miscellaneous items, in accordance with the Bidding Documents prepared by the ENGINEER.
The project was designed by Fishbeck (ENGINEER), who is to act as OWNER's representative.