Specifications include, but are not limited to: Construction of an outlet works consisting of 42-inch diameter steel pipe and an approximately 90-foot-tall combination gate and spillway tower. Construction of an approximately 23-acre wetlands mitigation area. Construction of recreation facilities including a boat ramp. Contract B: Supply Pipeline and Associated Structures ($6M-$7M) Construction of approximately 7,650 feet of the 42-inch-diameter supply pipeline and associated diversion structure on Beaver Creek. Contract C: Transfer Pipeline and Associated Structures ($12M-$14M) Construction of approximately 17,700 feet of the 36-inch diameter transfer pipeline, associated diversion structure on Beaver Creek, and multiple discharge structures.