Specifications include, but are not limited to: i. CONTRACTOR WILL BE RESPONSIBLE FOR ALL DAMAGES TO THE EXISTING TRACK, GOAL POSTS, AND OTHER EXISTING FIXTURES. II. Contractor will remove and dispose of the existing turf field and infill. III. Contractor will laser grade the existing area to manufacture tolerances. IV. Contractor will furnish and install new synthetic turf with the following: 1.End zone lettering in white – PINEDALE and WRANGLERS 2.End zones will be green 3.Center Logo will be white 4.Football lines will be white 5.Soccer lines will be yellow 6.Sidelines for football will be white 7.Main field to be alternating greens or a sold green with 12” white border 8.The District would like to discuss a variety of designs using the school colors. v. Contractor will perform regularly scheduled maintenance twice per year throughout the life of the warranty. This will be included in the price of installation. The inspection and maintenance will be performed by a personnel authorized by the turf manufacturer, that will include the grooming of the field with contractor’s equipment, checking of the seams, base inlays, and infill depth. vi. Contractor will provide an acceptable Gmax test result before final completion. vii. Contractor will provide sweeper and groomer training.