Specifications include, but are not limited to: Electrical site work to facilitate new medium voltage lines by Rocky Mountain Power (RMP). Line will come to a new utility distribution transformer, also by RMP. Contractor will be responsible to provide new pad and vault for unit. Sleeves for medium voltage junctions will be furnished by RMP but installed by this Contractor. A new secondary will be provided to an exterior distribution gear; and a new service entrance routed into the Administration Building. A new service shall also be routed to the Wrangler Gym from the new exterior gear; but scope shall be priced as an add alternate. After service switchover, Contractor will be responsible to disconnect and remove old transformers and medium voltage cable back to S&C switch. Transformers shall be serviced and delivered to Owner dictated location for storage.