Specifications include, but are not limited to: Sealed bids will be opened on Tuesday June 16, 2020 at 10:30 A.M. for WATER MAIN RELAYS WITH LEAD SERVICE LINE REPLACEMENTS at the following locations: W. Stark St. (WT410200646), N. 64th St. to N. 67th St. (30 working days); N. 67th St. (WT410200647), W. Fond Du Lac Ave. to W. Stark St. (24 working days); W. Hampton Ave. (S/S) (WT410200648), N. Sherman Blvd. to N. 46th St. (33 working days); W. Hampton Ave. (S/S) (WT410200649), N. 48th St. to N. 51st Blvd. (29 working days); N. 49th St. (WT410200650), W. Parkway Dr. to W. Hampton Ave. (61 working days); N. 48th St. (WT410200651), W. Parkway Dr. to W. Glendale Ave. (25 working days); N. 53rd St. (WT410200652), W. Glendale Ave. to W. Hampton Ave. (42 working days); N. 56th St. (WT410200653), W. Parkway Dr. to W. Hampton Ave. (41 working days); N. 57th St. (WT410200654), W. Parkway Dr. to W. Hampton Ave. (37 working days); (Note: Contractor to furnish and install approximately 10,201 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)