Specifications include, but are not limited to: remove and dispose of the three (3) existing pump motors and pumps; remove the three (3) existing gear reducers for service; remove and dispose of the motor to gear reducer couplings and gear reducer to pump couplings from the three (3) pump assemblies; provide (3) new pumps and three (3) new motors and install them on the existing baseplates; service three (3) existing gear reducers and re-install them on the existing baseplates; connect, align, and balance the new motors, the re-installed gear reducers, the new pumps, and the new couplings; provide all necessary piping and pipe fittings to connect the existing seal flush water supply to the three (3) new pump seals for seal lubrication and connect the seal flush water supply; and complete a seven-day test run for each of the three (3) pumps.