Specifications include, but are not limited to: In general the work consists of: encapsulating existing surfaces and constructing new finishes in 33 the former indoor firing range (IFR) to allow for general use by staff and the public. Contractor 34 shall remove and salvage existing items and equipment, clean walls, floors, and ceilings, 35 encapsulate and construct new finishes, and reinstall salvaged items and equipment. New 36 finishes are described as follows: 37 38 • Walls – PVC panels (white) 39 • Concrete floors –epoxy, new flooring to having minimal seams 40 • Precast Ceiling – seal joints and paint, some areas will PVC panels (grey) 41 42 Light fixtures and unit heaters will be salvaged and reinstalled. IFR spaces will not be connected 43 to ducted HVAC system if available and verify.