Specifications include, but are not limited to: B. Scope of Work: 1 Roofs 1, 3, 8, 9, 16 & 17 a. Remove and dispose of rock b. Remove and dispose of roofing c. Examine and replace any wet insulation (unit price). d. Installsaddles between all drains. e. Install a layer of 1½” polyisocyanurate roof insulation. f. Mechanically attach to the metal deck – per the roof manufacturer’s requirements. g. Install Fully Adhered 60 mil EPDM roofing system h. All new roof metals. On Roof 17 add gutter and downspouts i. Roof 16 replace existing gutter and downspout j. 20 yr. “NDL” labor and material manufacturer’s warranty to be issued upon completion. k. Note: Roof 17 has been a previously problematic area. Care to be taken during tear-off to determine the previous cause of failure and to remedy with the new roof. Proper reglet must be cut into decorative fluted brick areas of roofs 14 & 15 if not done so already. l. At the termination of roof 16 with 13 run roof membrane up wall and properly tie in under existing roof 13 flashing, adhere to wall. Fill fluted brick area with insulation and plywood flush with wall brick. 2 Roof 2 a. Infill metal roof with polyisocyanurate to height of flutes. b. Over lay entire roof with 2” polyisocyanurate. c. Mechanically attach to the metal deck per the roof manufacturer’s requirements. d. Fully Adhered 60 mil EPDM roofing. e. All new roof metals f. 20 year “NDL” labor and material manufacturer’s warranty to be issued upon completion. 3 Roofs 10 & 11 a. Remove and dispose of rock b. Remove and dispose of roof c. Examine and replace any wet insulation (unit price) d. Install a layer of 2” polyisocyanurate insulation. e. Install new 60 mil ballasted EPDM roof system. f. Replace existing gutter and downspout g. Install all new roof metals. h. Issue 20 yr. “NDL” manufacturer’slabor and material warranty.