Specifications include, but are not limited to: The scope of work includes: 1. Removing and salvaging existing optical sorter and eddy current. 2. Providing and installing new optical sorter, eddy current and related appurtenances. 3. Providing and installing a new PET quality control (QC) station. 4. Modifying the existing PET QC station to function as aluminum QC station. 5. Modifying existing pneumatic and mechnical conveyance systems as required to provide a fully functioning system. 6. Integrating new equipment into the existing system. 7. Preparing detailed shop drawings, construction layout, component fabrication, shipping, assembly/installation, quality assurance, start-up/shake-down, system warranty, operations & maintenance manual, and operator training necessary to provide a fully functioning container line recycling system upgrade.