Specifications include, but are not limited to: Renovation of a single room that requires furring out of the ceiling and perimeter walls, installation of a new water-based epoxy floor coating and a new interlocking floor over the epoxy flooring, painting of the walls and ceiling and installation of vinyl base. An electrical sub-panel will be removed. Light fixtures, fire alarm devices and a single HVAC unit will be replaced. The area of work has been cleaned to Department of Defense (Pb) lead dust level standard (40ug/sf). The State will be responsible for testing of lead levels after rough-in work is complete. The General Contractor is responsible for cleaning until lead levels are back to 40ug/sf after contractor’s work.