Specifications include, but are not limited to: 1. Saw-cut existing asphalt paving within raised island to assess cause of sinking hydrant and deteriorated paved areas 2. Restore sub-base to support replacement hydrant, water supply piping (as required) and asphalt paving; compact sub-base to establish appropriate support 3. Install new hydrant and repair / replace supply piping as required; new hydrant shall be oriented to provide access from the west 4. Saw-cut concrete curb and gutter at area of deteriorated paving 5. Reset curb inlet on restored (compacted) sub-base; stabilize all connections between underground storm sewer components 6. Install new concrete curb and gutter to match and align with existing adjacent to remain 7. Provide separate line item alternate costs to replace area of damaged concrete drive lane adjacent to subject area of work.