Specifications include, but are not limited to: In general the work consists of construction of a single story, 2,068 sf physical training room constructed of brick and CMU walls, a slab-on-grade, frost wall foundation and a steel joist framed with EPDM roof. The addition will have aluminum storefront windows, hollow metal doors and frames, one exterior overhead door and one interior coiling fire door. Brick veneer at the existing building will be removed, cleaned and salvaged for the Agency. The project will include a single, HVAC unit installed on the interior of the addition with a roof mounted condensing unit. The Agency will connect the unit to the building DDC system. New interior and exterior lighting, switching and (2) large interior ceiling fans are included in the work. A new drinking fountain will be installed that will require trenching in the existing building.