Specifications include, but are not limited to: DELIVERY The Contractor shall provide chemicals in a manner that is safe and acceptable to Rock County. The Contractor must provide a drum-less delivery method. The drum-less method must be designed to minimize handling by Rock County. Contractor shall provide delivery personnel with annual chemical and safety handling review training. TESTING EQUIPMENT The Contractor shall provide complete water testing equipment with reagents and shall train personnel in proper testing procedures and proper maintenance of treatment systems and equipment. Contractor shall also include bacteria dip slides for each cooling tower system location. EQUIPMENT INSPECTION Whenever a chiller, exchanger, or other equipment is available for internal inspection, the Contractor’s technical representative shall be present for inspection. .SERVICE VISITS – 12 TO 15 SERVICE VISITS PER YEAR During every regular service visit, the service representative shall: Review daily plant test records. Discuss in-depth any operating or water related questions or problems. Inspect any open water handling equipment. Run analyses of pertinent samples from all treated systems. Submit a complete written report of all findings and recommendations to designated management and operating personnel. Provide a sample copy of a monthly Professional Service Report with Proposal. Submit water or deposit samples to company's R&D Laboratory if any unusual conditions exist. Check inventory and calculate a material balance to ensure proper dosing of all systems. Meet with appropriate personnel for a review of the overall water treatment program(s). Work on special projects to improve the water treatment program(s).