Specifications include, but are not limited to: The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans. • Remove completely and dispose of existing roof consisting of three layers (ballasted EPDM and two built-up) down to the concrete deck • Disposal of the existing roof will include the removal of all asbestos containing material • Install one (1) layer of 2.5” ISO insulation over sloped deck in insulation adhesive • Install 1.4” fiberglass roof board in insulation adhesive • Install fully adhered .060” EPDM Roofing system per manufacturer current specifications • Fabricate and install new coping and edge metal using 24 gauge Kynar finished, or equal metal • Fabricate and install new counterflashing and one (1) scupper using 24 gauge Kynar finished, or equal metal • Provide manufacture’s 15 year labor and material warranty upon completion