Specifications include, but are not limited to: The design and construction of curb ramps at approximately 122 locations along US 33, WV 92, CO 9, CO 219/34 in Elkins, CO 5/4 in Coalton, US 219 and WV 72 in Parsons, WV 32 (NB & SB) in Thomas, and WV 32 in Davis to ensure ADA compliance. DOH intends to enter into a contract, which shall include but is not limited to: • Survey Services – no mapping will be supplied by the DOH • Right of Way Acquisition – All necessary plans and acquisition of right of way to construct the Project if deemed necessary • Project Services – preparation of construction plans as detailed in the Project Scope and shall include but are not limited to Design and Project Management; • Utility Coordination and Utility Relocation Services