Specifications include, but are not limited to: • clearing and grubbing at the site and burning the cleared and grubbed material to ash and removing all debris, trash, and garbage; • Install erosion and sediment control with best management practices to include silt fence, hay bale dikes, rock check dams, sumps, and rocked culvert outlet protection; • construction and installation of support areas and access roads to the site and coordination of work activities with residents and complying with WVDOH rules and regulations; • complete construction access ramp; • excavation and placement of material for Pond No. 1 embankment construction; • construct Pond No. 1 emergency spillway; • regrading and revegetation of the project site as approximated by the lines and grades shown on the Project Plans, and the moving of all unsuitable or excess material to a Contractor-locate and/or WVDEP permitted waste disposal area