Specifications include, but are not limited to: 1. General Construction, electrical, plumbing, mechanical, fire, sprinkler, data will be a Single Prime 2. Power and Data connections for media and menus is provided under the Single Prime 3. All final kitchen equipment connections including any “hard wiring”, plumbing and mechanical connections are by the Single Prime 4. Startup of equipment is thru the kitchen equipment contractor. Specific vendor techs will be used in some cases. 5. The hoods, fans and makeup air units associated with the kitchen work will be shipped to the Single Prime’s mechanical subcontractor for delivery and installation. 6. Stainless wall panels will be with the hoods and installed by the Single Prime. 7. All other HVAC equipment purchase will be by the Single Prime. 8. All penetrations and openings for kitchen equipment including hood duct, electrical wiring, refrigerant piping, plumbing, HVAC equipment is to be done by the Single Prime.