Specifications include, but are not limited to: 4.3.5.1 Vendor should provide their single acquiring platform solution as required in 4.4.3.4. Please describe any gateway, front end authorization and back end settlement platforms for this solution. 4.3.5.2 Vendor should describe how the solution supports dynamic currency conversion for international cards. 4.3.5.3 There are several spending units with a small volume of transactions. Describe the Vendor’s ability to provide alternative merchant processing methods (e.g., verification by phone). 4.3.5.4 Describe the Vendor’s controls in place to protect data integrity (i.e., ensuring that data is not lost or duplicated). 4.3.5.5 State the Vendor’s maximum authorization volume capacity on CP and CNP, including maximum number of items in a batch, maximum number of batches processed per day, and any other system limitations. Include the max tps on any platform including gateway, tokenization and authorization. 4.3.5.6 Vendor should outline the funding schedule and daily cutoff times for next day settlement and funding for each card type split between Card Present and Card Not Present (as required in 4.4.2.4). The STO prefers cutoff times be the same for all card brand types. The STO also prefers an 11:00pm EST, or later, cutoff time. 4.3.5.7 Vendor should describe the recommended settlement design for both card present and card not present transactions. The STO prefers batch settlement for both card present and card not present. 4.3.5.8 Provide the Vendor’s settlement funding SLA. Indicate the percent of time the Vendor met this SLA for each of the last 12 months. The STO prefers 100% percentage rate. 4.3.5.9 Vendor should provide examples of the following invoices. The STO prefers invoices that include transaction data with breakdown of costs. Monthly STO invoice (E-Government/L-Government) Monthly fee breakdown monthly spending unit acquiring invoice (Card Present) Monthly spending unit terminal services invoice 4.3.5.10 Describe how Vendor proposes to handle funding processes including notification and ability to meet settlement deadlines as required in 4.4.2.4.