Specifications include, but are not limited to: The scope of work for this Project will include design, construction, construction engineering and management of the Project. The design work will include but is not limited to surveys, geotechnical work, hydraulic analysis, scour analysis and structural design. The designs shall meet all appropriate DOH design guidelines as set forth in the DOH Design Directives (Latest Edition) (DD), DOH Traffic Engineering Directives (TED), DOH Bridge Design Manual (BDM), DOH Drainage Manual, (Latest Edition), DOH Erosion and Sediment Control Manual, DOH Temporary Traffic Control Manual, West Virginia Department of Transportation Division of Highways Right of Way Manual (Rev. 10/2018), DOH Standard Detail Book(s) Vol. 1-3. Construction will include but is not limited to all necessary roadway and bridge work, drainage, utility coordination, erosion and sediment control work items, necessary foundation work, substructure work, superstructure work and traffic control. Construction engineering and management, including quality control, will be the responsibility of the Proposer. Proposer shall fully cooperate with, and provide a QC database to the DOH. Construction will comply with DOH Standard Specifications for Roads and Bridges 2010, Supplemental Specifications (January 1, 2019), DOH Construction Manual (October 2006*), and any special provisions included in the Proposal.