Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 106.000 _________._____ _________._____ 0020 211008-000 ROCK BORROW EXCAVATION TN 138.000 _________._____ _________._____ 0025 229001-000 SHOULDERS AND DITCHES MI 0.020 _________._____ _________._____ 0030 307001-000 AGGREGATE BASE COURSE, CLASS I CY 7.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 28.000 _________._____ _________._____ 0040 408002-001 ASPHALT MATERIAL GA 23.000 _________._____ _________._____ 0045 415005-001 STANDARD MILLING SY 232.000 _________._____ _________._____ 0050 614001-003 HP10X42 STEEL PILE LF 292.000 _________._____ _________._____ 0055 614003-001 CONCRETE LAGGING, THICKNESS 6 Inches SF 240.000 _________._____ _________._____ 0060 636009-002 TEMPORARY PAVEMENT MARKINGTAPE 6 IN, TY VII B LF 144.000 _________._____ _________._____