Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 129.400 _________._____ _________._____ 0015 207034-000 FABRIC FOR SEPARATION SY 57.200 _________._____ _________._____ 0020 211008-000 ROCK BORROW EXCAVATION TN 45.700 _________._____ _________._____ 0025 211009-000 SELECT BORROW EXCAVATION TN 175.300 _________._____ _________._____ 0030 229001-000 SHOULDERS AND DITCHES MI 0.030 _________._____ _________._____ 0035 408002-001 ASPHALT MATERIAL GA 9.000 _________._____ _________._____ 0040 415005-001 STANDARD MILLING SY 98.000 _________._____ _________._____ 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 2 LF 137.500 _________._____ _________._____ 0050 607037-001 BUFFER END SECTION EA 2.000 _________._____ _________._____ 0055 614001-003 HP10X42 STEEL PILE LF 905.000 _________._____ _________._____ 0060 614003-001 CONCRETE LAGGING, THICKNESS 8" SF 780.000 _________._____ _________._____ 0065 636009-002 TEMPORARY PAVEMENT MARKINGTAPE 6 IN, TY 6- WHITE LF 48.000