Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 207001-001 UNCLASSIFIED EXCAVATION CY 192.600 _________._____ _________._____ 0015 207034-000 FABRIC FOR SEPARATION SY 46.600 _________._____ _________._____ 0020 211009-000 SELECT BORROW EXCAVATION TN 257.200 _________._____ _________._____ 0025 229001-000 SHOULDERS AND DITCHES MI 0.050 _________._____ _________._____ 0030 408002-001 ASPHALT MATERIAL GA 25.900 _________._____ _________._____ 0035 604050-020 24 INCH HIGH DENSITY POLYETHYLENE PIPE, PROFILE WALL LF 35.000 _________._____ _________._____ 0040 605009-001 TYPE G INLET EA 1.000 _________._____ _________._____ 0045 607001-001 TYPE 1 GUARDRAIL, CLASS 3 LF 112.500 _________._____ _________._____ 0050 614001-006 HP12X53 STEEL PILE LF 594.000 _________._____ _________._____ 0055 614003-001 CONCRETE LAGGING, THICKNESS 8" 3'-9" SF 580.000 _________._____ _________._____ 0060 636009-002 TEMPORARY PAVEMENT MARKINGTAPE 6 IN, TY 6 - WHITE LF 64.000 _________._____ _________._____