Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 11,472.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 2,054.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 16,171.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 2,521.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 1,215.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 736.000 _________._____ _________._____ 0045 311006-001 OPEN GRADED FREE DRAINING BASE COURSE CY 560.000 _________._____ _________._____ 0050 408002-001 ASPHALT MATERIAL GA 490.000 _________._____ _________._____ 0055 410001-030 SUPERPAVE ASPHALT BASE CRSE, TY 19 SY 10,014.000