Specifications include, but are not limited to: • Selective demolition including the demolition of approximately 10 ft marble wall • Electrical • Data (CAT-6) • HVAC including controls by Siemens. Siemens shall provide a detailed itemized quote per WVU contract. • Audio Visual infrastructure. Audio visual wires, equipment and installation will be provided by others. • Fire alarm devices including installation, programing and activation • Sprinklers • Door hardware including electronic card access – should match HSC existing • Ceiling grid and tiles • Provide 2 nd shift costs – afternoon and night • ALTERNATE - (addition) Provide Simulation Lab cost • Contractors are responsible for their own parking • Contractor should provide "in-wall" chief boxes.