All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: MOBILIZATION; ASPHALT MATERIAL; STANDARD MILLING; TRAFFIC CONTROL DEVICE; PROJECT TRAFFIC CONTROL DEVICE CLEANING; INDIVIDUAL TRAFFIC CONTROL DEVICE CLEANING; TRAFFIC DIRECTOR; ELECTRIC ARROW ; CHANGEABLE MESSAGE SIGN; The work shall consist of removing all or part of the existing expansion joint assemblies as shown in the plans, modifying existing expansion dam as directed in the plans to accept the new bridge expansion joint system, furnishing and placing structural concrete or elastomeric concrete for the installation of the new bridge expansion joint system as directed in the plans, and placing a new Preformed Silicone Coated Foam Bridge Expansion Joint System at the locations indicated on the plans. The construction shall be in accordance with this Specification and in reasonably close conformity with the plans or as established by the Engineer.