Specifications include, but are not limited to: 1.Remove existing roofing and/or roll roofing down to the underlying wood roof deck and dispose of properly.2.Inspect the existing roof deck. Replace or repair any defective roof decking(estimated to be approximately 32 sq. ft.).3.Install 20 year rubber roofing(minimum of 60 mil) or 30 year rubber roofing over approximately 36,000 sf of roof area.(Please note that Bidder mustschedule a time to inspect the roof and take the necessary measurements.)4.Install necessarywalk pads (minimum of 3 feet wide) to rooftop HVAC units.5.Install walk pads around perimeter of all roof top A/C units.6.Install 3 foot X 3 foot pad at top and bottom of upper ladder access and top of lower ladder access point.7.Install ice and water shield where needed.8.Install new boots around all vents.9.Install any step and counterflashingthat may be needed.10.Coat and seal all parapet walls as necessary.11.Install drip edge.