Specifications include, but are not limited to: 9.1 Removal of walls 9.1.1 Vendor shall remove approximately 216ft2 of wall space 9.1.2 Vendor shall remove existing floor pan and floor coating down to the concrete base, approximately 100ft2. 9.1.3 Vendor shall keep the work area as clean as possible during the entire progress of work, and shall be responsible to remove from the site, the packing materials from his products and other debris as it accumulates. 9.2 Installation of new walls 9.2.1 Vendor shall replace walls with .500 (1/2”) Cement Backer Board 9.2.2 Vendor shall fabricate and install a new fiberglass textured waterproof floor pan 9.2.3 Vendor shall install water proof membrane such as RedGard Waterproofing or equal to walls, allowing for proper drying and cure time 9.2.4 Vendor shall replace 4” porcelain tile walls with Corian material, tile color/design to match as closely as possible to existing tile. 9.2.5 Vendor shall inspect existing conditions governing this work during pre-bid site inspection to determine conditions and extent of work required. No allowance will be made subsequently on behalf of the vendor for any error or negligence on his part in connection with this requirement. 9.2.6 Vendor shall inspect all elements subject to movement or damage prior to commencing work. 9.2.7 Vendor shall coordinate with the Owner for the proper relation of the work to the building structure and to the employees therein. In the event of conflict, the Owner shall prevail. 9.2.8 Vendor shall take all necessary precautions to protect the interior of the building from debris, dust or any residue occurring from the scope of work.