Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 590.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 194.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 1,210.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 57.000 _________._____ _________._____ 0035 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 168.000 _________._____ _________._____ 0040 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 41.000 _________._____ _________._____ 0045 307001-000 AGGREGATE BASE COURSE, CLASS 3 CY 23.000 _________._____ _________._____ 0050 408002-001 ASPHALT MATERIAL GA 6.000 _________._____ _________._____ 0055 607001-001 TYPE 1 GUARDRAIL, CLASS 1 LF 175.000 _________._____ _________._____ 0060 607025-001 CUT SLOPE TERMINAL, TYPE A EA 1.000 _________._____ _________._____