Specifications include, but are not limited to: • Edge mill 1.5 inch of existing asphalt from face of curb to a distance adequate to provide proper tie-in within the specified limits. • Place 1.5-inch hot laid bituminous asphalt after the pavement removal is completed. • Included in this contract is a quantity for reconstruction of fail sections of the roads. This will be paid by Square Yard. This price shall include excavation, 6” of asphalt base material or concrete, and 1.5” asphalt wearing. • Adjust water valves, manholes, and inlets where applicable. The adjustment will be completed by the use of precast iron risers similar to those manufactured by East Jordan or equal. Sealing on the inside of the riser ring will be required for all sanitary manholes. See attached specification, an equivalent product may be used.