Specifications include, but are not limited to: g and management of the Project. The design work will include but is not limited to surveys, geotechnical work, hydraulic analysis, scour analysis and structural design. The designs shall meet all appropriate DOH design guidelines as set forth in the DOH. 1. Survey Services 2. Right of Way Acquisition and Plat/Plan Preparation if necessary 3. Roadway and Bridge Plan Preparation 4. Permit Preparation 5. Preliminary and Final Bridge Design 6. Drainage Design including Sediment and Erosion Control 7. Geotechnical Design 8. Construction 9. Project Management 10. Construction Management 11. Quality Control (QC) including Inspection and Testing 12. Temporary and Final Traffic Control 13. Utility Coordination and Relocation