Specifications include, but are not limited to: Water Treatment Plant improvements include heating, ventilation, and air conditioning (HVAC) improvements in the Filter Room, Office/Laboratory, and Soda Ash Room. Electrical improvements at the Water Treatment Plant include plant power system improvements, to include a new auto matic transfer switch, auxiliary power generator, replacing panelboards, and revamping the motor control center. Electrical improvements also include replacing receptacles and wiring damaged by corrosion and providing wiring to new HVAC equipment. The Water Treatment Plant control panel will be replaced and programmed as part of the improvements. Additive work includes replacing motor oper ated valves and valve operators as well as solenoid valves on the three water filtration units.