Specifications include, but are not limited to: Boundary surveying Topographical and site surveying Mapping Platting and replatting of existing subdivisions Construction staking Monument preservation and DNR permit processing The City of Spokane will provide the consultant with: current survey codes, prototype drawings, shape files, and plotter files. The consultant shall apply the follow standards in preparation and delivery of survey data: Survey and topographic data shall be collected using City of Spokane codes Electronic files containing survey data, topographic data, design drawings, construction drawings, and as-built drawings shall be submitted in State Plane coordinates in accordance with City of Spokane standards and current RCWs (not in Ground) Design files shall be developed in accordance with the latest version of City of Spokane Design Standards CAD files shall be developed in accordance with the latest version of City of Spokane Design Standards Electronic deliverables shall be formatted to the City of Spokane’s current software suite Deliverables shall be provided on a thumb drive or equivalent electronic means