Specifications include, but are not limited to: The work consists of installing approximately 900 linear feet of wood and rock revetment along the south bank of the North Fork Snoqualmie River. Work includes erosion and sediment control, temporary excavation and grading (0 – 550 CY net excavation), seeding, and mulching as a temporary cover measure interim to site planting and restoration performed outside this contract. Quantities of some major items include: • 20 Revetment Structures • 4 Bank Deflector Structures • 48 Salvaged Trees (maximum) placed on-site. • 17,200 CY Common Excavation • 3,100 CY Wet Excavation • 4,700 Tons Scour Protection Rock • 2,340 Tons Ballast Fill (Import) • 3,450 CY Ballast Fill (Placement)