Specifications include, but are not limited to:. This contract work consists of providing all labor, materials and equipment necessary to trim, cut, treat, remove, clear, and dispose of trees and brush, as well as perform application of herbicides under and along approximately 60 pole miles of the District’s Distribution and Transmission System. Work location is in the vicinity of Stanwood & Sultan, Snohomish County, Washington. Specific work location commences at North Stanwood Substation and goes North on Pioneer Hwy to just North of 92nd Avenue NW. The line goes West on 300th Street NW from Pioneer Hwy to 3rd Avenue NE. From 300th Street NW the line goes North on 76th Avenue NW to 332nd Street NW, North on 68th Avenue NW to 332nd Street NW and South on 68th Avenue W to 285th Street NW. The line goes West from 68th Avenue West on 324th Street NW to English Grade Road then goes South on Brandstrom Road from 324th Street NW to 300th Street NW. The Transmission line comes from the Jackson Dam and goes South on the Sultan Basin Road to Hwy 2. Contractors must be prequalified prior to bidding on this prequalified electrical work for Category D-1 “Right-of-Way Clearing and Maintenance, Tree and Brush Work.”