Specifications include, but are not limited to: The work to be performed is to replace approximately 26,695 linear cable feet of depreciated underground cable at twenty-five (25) locations throughout Snohomish County. In addition, setting five (5) distribution poles & framing. The primary method for installing new conduits will be directional boring to minimize ground disturbance. If the Contractor is not currently prequalified for category B-6 (Directional/Conventional Boring) they must utilize a subcontractor who is currently prequalified by the District. All bore conduit installed shall be provided by the Contractor. The District will provide conduit, bends, and fittings to intercept/re-route or repair existing PVC conduit, and to tie bore conduit into vaults. The Contractor shall be responsible for the restoration of all surfaces disturbed in association with their work. This includes paving, concrete and landscaping. All restoration work shall be per the District standards and/or the associated jurisdiction's asphalt and concrete restoration requirements.