Specifications include, but are not limited to: The purpose of this Request for Proposal (RFP) is to obtain proposals to supply and deliver a landfill gas (LFG) flare for the Leichner Landfill. Requirements for the LFG flare. The flare to be provided is intended to be a replacement for the existing flare at the Landfill. Replacement of the existing flare is required as the existing flare is over sized for the quality and quantity of LFG being produced within the Landfill. Due to the age of the waste in the Landfill, the average LFG flow rate to the flare in 2018 (from the gas collection and control system or GCCS) was 110.5 standard cubic feet per minute (scfm) at 39.2 percent by volume (% vol.) methane (86.6 scfm normalized to 50% vol. methane). Because of the declining LFG generation rates, the County would like to replace the flare with a more appropriately sized enclosed flare with greater turndown capability. SCS Engineers (SCS) will provide engineering and field support for the installation and startup as “County Contractor”. Approved subcontractors will provide the following services: • Structural-anchor design for the flare • Electrical supply and connections • Removal of existing flare, and offload of supplied flare • Control panel installation and programming • Flare exhaust stack testing