Specifications include, but are not limited to: The Contractor shall provide planting and restoration maintenance services as described herein at restoration sites identified by WLRD. WLRD Project Manager (PM) will provide a Work Order that details the Scope of Work for each project. WLRD PM will execute notice to proceed for each Work Order issued. The services listed in these specifications shall be performed as needed and as agreed to by both parties. The Contractor shall have the capability to perform all services of the awarded contract in the designated categories: a. Site Preparation and Management b. Planting and Replanting c. Pesticide Application d. Mechanical/Manual Vegetation Management e. Watering/Irrigation The Contractor shall be responsible to transport all equipment, materials, supplies, fuel and debris to and from each work site. There is no secure on-site storage for Contractor equipment or materials. The Contractor shall be responsible for obtaining all required licenses and permits for their staff. WLRD will obtain necessary environmental permits. All work shall be commenced and completed in a timely and professional manner as negotiated within the work order.