Specifications include, but are not limited to: Replacement of approximately 1,600 lineal feet of existing 8” sewer main with new 12” PVC sewer main including manholes, side sewers to adjacent properties and connection to KCWTD Juanita Interceptor; all of which is Schedule A. The replacement of existing 6” and 8” water main with approximately 1,600 lineal feet of new water main raging in size of 4” to 16” including connections to existing water mains, replacement of water service piping, water meter boxes and fire hydrants, all of which is Schedule B. Upgrade of concrete sidewalk accessible ramps and a complete 3” grind and overlay, all of which is Schedule C. The upgrade of the accessible ramp at the termination of the WSDOT pedestrian bridge which is Scheduled D. The estimated cost for this project is in the range of $2,400,000 to $2,700,000 for all schedules.