Specifications include, but are not limited to: 1) Boating Facility Replacement project Project elements include the replacement of a failed timber breakwater, installation of new moorage float support piles, and shoreline stabilization within the inner harbor shoreline (adjacent to the boat ramp and breakwater). 2) Outer Shoreline project Project elements include shoreline protection along the south facing shoreline along Admiralty Inlet, located adjacent to the Coupeville Ferry Terminal Harbor Entrance Channel Jetty, for the protection of the exposed restroom structure and parking lot Consultant to assume the following will be provided by State Parks, upon award of Contract and once available: 1) Preliminary assessment data 2) Topographic basemap for both project areas (Boating Facility Replacement and Outer Shoreline). 3) Results of investigative geotechnical borings, taken in the Boating Facility Replacement project area.