Specifications include, but are not limited to: The work to be performed by the Consultant consists of completing a planning level corridor study for the subject project. Some major tasks included in the Scope are as follows: Collect data including traffic, environmental, and survey. Examine multimodal safety and mobility issues. Determine preferred alignment, cross sections, and intersection control. Perform preliminary environmental activities, studies. Identify preferred stormwater strategies and mitigation strategies. Document right-of-way needs for the preferred design. Prepare implementation strategies and future project estimates. Develop preliminary design for the corridor. This consultant project has a mandatory nine percent (9%) UDBE goal. The City reserves the right to retain the services of the successful Consultant for any subsequent phases associated with this project including preliminary and final design.