Specifications include, but are not limited to: The project consists of excavation, and disposal of approximately 25,000 cubic yards (CY) of soil from the project site, construction and installation of 6 large habitat structures, relocation and placement of 3,900 CY of mulch, relocation and placement of 3,900 CY of topsoil, and placement21,500 SY of coir fabric. The project site is bounded by the Green River to the north and east,SR 516 to the south, and the bridge crossing at Mullen Slough to the west. All of the above work is necessary as preparation for the future Downey Farmstead Restoration project, which will improve salmon habitat and reduce flood risk along the Green River. All work will be in accordance with the Contract Plans, Kent Special Provisions, and the current WSDOT Standard Specifications.