Specifications include, but are not limited to:. The Work includes but is not limited to the following: furnish all labor, materials, tools, equipment, and supervision for: a. Demolition, repair, or replacement of existing docks, decks, or other pier components, including, but not limited to, fender systems, fender piling, mooring piling, support piling, dolphin piling, bulkheads, floats, bullrails, bollards, camels, vaults or other pier components of various design and materials. b. Installation of rip rap / armor stone for shoreline stabilization. c. Underwater welding and cutting of various steel supports and structures. d. Underwater inspections. e. Debris and vessel retrieval. f. Installation of drilled soldier piles and micro-piles.