Specifications include, but are not limited to:. The Railroad Place, Newton and Delta Street Utility Improvements Project consists of three schedules of work. The first Schedule A: Water and Sanitary Sewer Improvements provides for the installation of approximately 2,100 LF of 8-inch DI water main, 830 LF of 8 inch PVC sanitary sewer main, repair of existing sanitary sewer pipe, five manholes, 25 water services and associated surface restoration. In addition, the schedule includes the installation of 470 LF of 10 inch HDPE water main installed by direction drilling. Schedule B: Street Improvements provides for street widening, storm drainage and cement concrete curb/gutter improvements on SE Newton Street between Olmsted Place SE and Railroad Place SE, road reconstruction on Railroad Place south of SE Delta Street road reconstruction on Reinig Place SE and Maple Avenue SE cul-de-sacs, south of SE Newton Street. Schedule C: Sidewalk Improvements provides for cement concrete sidewalk improvements on SE Newton Street between Olmstead Place SE and Railroad Place SE. Schedule D: SE Newton Street Water and Road Improvements (Railroad Avenue to Park Avenue SE) includes approximately 370 LF of 12-inch DI water main on SE Newton Street between Falls Avenue SE and Park Avenue SE. It includes a grind and overlay of SE Newton Street between Railroad Avenue to Park Avenue SE, as well as curb and gutter, sidewalk, curb ramp retrofits and minor storm improvements. Additive Schedule D may or may not be awarded.